What Is an Occupancy Certificate? OC and CC Explained

By the Valuepersqft advisory team

What Is an Occupancy Certificate? OC and CC Explained

Buyer guide Bengaluru · Hyderabad · Chennai 7 min read

An occupancy certificate, or OC, is the document the local planning authority issues once a building is complete, confirming that it has been built as per the approved plan and is fit to be lived in. It is the final approval in a building’s life, and it is what allows the developer to hand over homes for families to move in. In some states the same step is called a completion certificate, and the two are often mentioned together as “OC and CC”.

At a glance
  • The OC confirms a completed building matches its approved plan and is safe to occupy.
  • It is issued by the local authority, such as the city corporation or development authority.
  • Under RERA, the developer obtains the OC and shares it with buyers, who then take possession.
  • Homes sold after the completion or occupancy certificate do not attract GST.
OC confirms the building is fit to occupy 2 months to take possession after OC under RERA 7 min reading time

When you buy a new home, the paperwork moves through several stages: land and title documents, plan approval, RERA registration, the agreement for sale, and finally the sale deed and possession. The occupancy certificate sits at the end of that journey. It is the moment a building stops being a construction project and becomes a home, and leading developers plan their whole handover around it.

OC, CC and other certificates in plain words

DocumentWhat it meansWhen it is issued
Building plan approval (sanction)The authority approves the design: floors, height, setbacks, parking and useBefore construction starts
Commencement certificatePermission to start construction under the approved plan (used in some states)At the start of work
Completion certificate (CC)Confirms construction is complete as per the approved planWhen the building is finished
Occupancy certificate (OC)Confirms the building is fit to occupy, after checks such as fire safety, lifts, water and drainageWhen the building is finished, often together with or right after the CC

Note that “CC” can mean commencement certificate or completion certificate depending on the state and the context. When buyers talk about “OC and CC” at handover, they usually mean the occupancy and completion certificates.

Who issues the OC in each city

The occupancy or completion certificate comes from the same authority that approved the building plan.

  • Bangalore: the Greater Bengaluru Authority and its city corporations for most of the city, the Bangalore Development Authority for its own layouts, and the local planning authorities for areas outside the city limits.
  • Hyderabad: the Greater Hyderabad Municipal Corporation inside its limits, and HMDA or the local municipality in the wider metropolitan region.
  • Chennai: the Greater Chennai Corporation or CMDA within the Chennai Metropolitan Area, and DTCP or the local body elsewhere in Tamil Nadu, where the document is generally called a completion certificate.

For how approvals work for plots in Chennai, see our guide DTCP vs CMDA approval, and for Bangalore property records, A khata, B khata and e-khata.

How the OC is obtained

  1. The building is completed as per the approved plan, with lifts, fire systems, water, sewage treatment and power in place.
  2. The developer applies to the authority with the required documents, including the structural stability certificate, the fire department’s clearance where required, and the architect’s completion report.
  3. The authority inspects the building to confirm it matches the sanctioned plan and the safety requirements.
  4. The OC is issued, sometimes for the whole project and sometimes tower by tower or phase by phase.

In large communities and townships, it is normal for the OC to be issued in parts. A partial OC for one tower or phase lets those families move in while later phases are still being built. Our guide What is an integrated township? explains how phases work.

Why the OC matters to you as a buyer

  • It is the green light for possession. Once the OC is in place, the developer issues the possession notice, the sale deed is registered and you receive your keys.
  • It supports permanent utility connections. Permanent electricity and water connections for a new building are generally linked to its completion and occupancy approvals.
  • It confirms the home matches the plan. The OC shows the building was built as approved, which is what lenders, buyers and tenants look for.
  • It helps with loans and resale. Banks are comfortable lending on completed homes with an OC, and future buyers of your home will ask for it too.
  • It ends GST on new sales. GST applies to under-construction homes. A home sold after the completion or occupancy certificate does not attract GST. Our guide New launch vs ready to move covers what this means for your total cost.

The OC and RERA

The Real Estate (Regulation and Development) Act, 2016 makes the developer responsible for obtaining the completion or occupancy certificate from the authority and making it available to buyers, individually or to the residents’ association. RERA also asks buyers to take physical possession within two months of the OC being issued. Your project’s RERA page records its approvals and committed completion date, and many state portals publish the OC once it is uploaded. Our guide How to check RERA registration shows where to find it.

From OC to keys: what happens at handover

  1. Possession notice. The developer informs you that the OC has been received and the home is ready, with the final demand.
  2. Final payment. You pay the last instalment and the remaining charges. If you have a home loan, the bank releases the final tranche; see home loans for under-construction flats.
  3. Registration. The sale deed is registered at the sub-registrar’s office and stamp duty is paid; our guide to stamp duty and registration charges has the details for each city.
  4. Inspection and keys. You walk through the home with the developer’s customer team, note any finishing touches, and collect the keys.
  5. Association and utilities. Electricity, water and maintenance accounts are moved to your name, and you join the residents’ association.

Ready homes with an OC, and new launches

If you want to move in soon, a ready home means the OC stage is already behind you. Homes we track that are listed by their developers as ready to move in include Prestige White Meadows in Whitefield, Brigade Orchards in Devanahalli, NCC Urban Gardenia and Koncept The Botanika in Hyderabad, and TVH Quadrant in Chennai. Our advisors can take you through each project’s handover documents.

Prestige White Meadows, Whitefield, Bangalore
Prestige White Meadows, Whitefield, Bangalore
Listed by Prestige as ready to move in, in one of East Bangalore’s most established neighbourhoods. Developer: Prestige.
TVH Quadrant, Adyar, Chennai
TVH Quadrant, Adyar, Chennai
Listed as ready to move in, in one of Chennai’s most established addresses. Developer: TVH.

If you are happy to wait, a new launch from a leading developer gives you the widest choice of homes, and the developer takes the project all the way to OC and handover. Browse all new projects, or start from Bangalore, Hyderabad or Chennai. Leading developers such as Prestige, Brigade, Sobha and Godrej have long records of completing and handing over large communities; see What is a Grade A builder?

Our view

What we tell our clients

The occupancy certificate is the final step that turns a project into a home, and it is a reassuring part of buying from an established developer, who plans for it from day one. If you are buying ready, our team will take you through the handover documents. If you are buying a new launch, we will show you the developer’s past handovers and the project’s committed completion date on RERA. Tell us what you are looking for and we will take you through every document, from booking to keys.

Ask our advisors about a project →

Frequently asked questions

What is an occupancy certificate?

An occupancy certificate, or OC, is issued by the local planning authority once a building is complete, confirming that it was built as per the approved plan and is fit to be occupied.

What is the difference between OC and CC?

A completion certificate (CC) confirms that construction is complete as per the approved plan, while an occupancy certificate (OC) confirms the building is fit to live in. In some states CC also refers to the commencement certificate issued before construction begins.

Who gives the occupancy certificate?

The authority that approved the building plan, such as the city corporation, the development authority (for example BDA, HMDA or CMDA) or the local planning body.

Is GST payable after the occupancy certificate?

No. GST applies to homes sold while under construction. A home sold after the completion or occupancy certificate has been issued does not attract GST.

How long after the OC should I take possession?

Under the RERA Act, buyers are expected to take physical possession within two months of the occupancy certificate being issued.

Can an OC be issued for one tower of a project?

Yes. In large projects and townships, authorities often issue the OC tower by tower or phase by phase, so finished towers can be handed over while later phases continue.

More guides from our advisors

By the Valuepersqft advisory team Property advisors across Bengaluru, Hyderabad, Chennai, Pune and Mumbai for 8+ years, working with 40+ developers and 500+ projects.

Details are taken from public sources and developer information and may change. Please confirm current availability, prices and approvals with our team before making a decision.

Talk to a Valuepersqft advisor

Honest, unbiased property advice. Call +91 6366229758, email support@valuepersqft.com or book a free consultation.

Offices: Whitefield, Bengaluru · Nanakramguda, Hyderabad · Manapakkam, Chennai · Kharadi, Pune.